About this stamp
Teesta Low Dam-IV Power Station
A powerhouse and barrage beside a wide river in a green valley, captioned Teesta Low Dam-IV Power Station (West Bengal). The stamp carries the NHPC Limited name and logo, and it is one of twelve in NHPC’s 50th anniversary sheet.
The Teesta Low Dam-IV Power Station is in West Bengal. NHPC Limited, the Navaratna hydropower company set up on 7 November 1975, lists it at 160 MW and gives 2016 as its commissioning year.
My Stamp
My Stamp is India Post’s brand name for personalised sheets of stamps: twelve ₹5 stamps, each printed beside a small label. Organisations can order a Customised My Stamp, with a stamp design and labels of their own, usually to mark an anniversary; India Post’s terms set a minimum order for these. The picture on this page shows the stamp alone; the full sheet shows the organisation’s labels.
For More Information
Read more here: